Roof Water proofing system in Substation #1, 9, 16 and Plant 476 OME Building.
Client Name: Saudi Aramco, Location:Berri Gas Plant, Jubail.
Concrete Pipe Supports Repair
Perform Civil and Mechanical Work @ RTR Plt #151 Area 4.
Client Name: Saudi Aramco, Location:Rastanurah Refinery.
Excavate Trench Work
Excavate Trench to Run Spare Control and Signal Cables.
Client Name: Saudi Aramco, Location:Ju’aymah Gas Plant.
Maintenance Work
Replacement of Underground Water Asbestos Pipes 250mm (OD) at Doha.
Client Name: Saudi Aramco, Location:Doha
Replace 6 Chilled Water Pumps & One Cooling Water Pumps
Replace 6 Chilled Water Pumps
Increase Pressure & Flow of Raw Water System @ Qurrayah
Complete 100%
Replace SCUM Pump G5 & Return Sludge Pump G3 at STP
Complete 100%
Revovation Of Engineering Building Coffee Room
Complete 100%
Replace Effluent Return Pump- B ( M64-G-057B) In Hida Pumping
Complete 100%
Industrial Electrical Works
Complete 100%
Revovation Of Engineering Building Coffee Room
Complete 100%
Increase Pressure & Flow of Raw Water System @ Qurrayah
We Complete project on 12/15/2018
Replace SCUM Pump G5 & Return Sludge Pump G3 at STP
We complete the Project on 07/31/2018.
Revovation Of Engineering Building Coffee Room
We Complete project on 02/28/2019
Replace 6 Chilled Water Pumps & One Cooling Water Pump at
We Completed Project On 01/27/2019
Replace Effluent Return Pump- B ( M64-G-057B) In Hida Pumping
We Completed Project On 11/27/2018 (100%)
Replace Five (5) Pumps at AC Plant No. 2, Abqaiq
We Completed Work on 1/22/2020 ( 100%)
Install Backup Power Supply- For Shedgum Drilling Work
We Completed work on 10/31/2019 ( 100%)
RTR HR Building Renovation
We completed 100%